A small group of prefabricated homes can involve complex logistics. On 2 October 2024, Kodasema published a six-KODA project near Switzerland’s Albis Pass, showing why site review should precede purchasing units.
The documented ensemble
The manufacturer identifies four KODA Loft Extended units and two KODA Loft units. It describes placement inside a hairpin bend overlooking Lake Zurich and highlights transport and lifting challenges. The slope also required earthworks to prepare the site.
The evidence supports six units and documented delivery. The publication does not identify tourism returns, occupancy or annual profit. We therefore treat it as a site-delivery case, not an audited investment.
The catalogue does not describe all site work
Our interpretation is that a small-development promoter should study access, manoeuvring, supports and outdoor areas alongside the home model. Attractive product photographs can generate interest, but the budget needs to include reaching and preparing the site.
Questions before reservation
- How does the transport arrive and where can a crane operate?
- Which levelling, drainage and retaining works are needed?
- Which model variants are planned?
- Which services and maintenance will the ensemble require?
The case does not prove that any site can accommodate six units or establish Spanish permitting. It offers a real experience to inform feasibility questions and coordination between manufacturer and local team.
Source and date
Project stakeholder documentation. 2 octubre 2024 / 2 October 2024.
Reviewed 11 October 2026. Interpretation and feasibility questions are CasasCápsula editorial analysis.
Another real case: homes and community at Community First!
Considering a similar project?
Tell us your intended use, location and scale. We also welcome documented manufacturer and operator projects to expand this library of real experiences.