Panelised or volumetric prefabricated homes: what reaches the site
Two homes advertised as prefabricated may reach the plot in very different forms.
Read article →CasasCápsula
Two homes advertised as prefabricated may reach the plot in very different forms.
Read article →
Comparing Volferda's published E3 and E8 data and the questions still to answer about usable space, equipment and delivery.
Read article →
The public K30 specification contains dimensions and configurations to clarify. How to request an identifiable quotation without treating a catalogue as verified.
Read article →What Cecotec’s investment and inHAUS’s proposed housing factory mean—and which milestones remain to be verified.
Read article →Spain’s energy-certificate exclusion for detached buildings below 50 m² is not a blanket exemption for every small home.
Read article →B, B96 or B+E in Spain: compare the car and trailer’s maximum authorised masses and technical compatibility before arranging a tiny-house move.
Read article →What to check about radon before installing a capsule home: indicative maps, project design and measurement are different steps.
Read article →A checklist for asking about transport, lifting, waiting on site and occupation, without assuming one insurance policy covers every stage.
Read article →From factory equipment to commissioning in Spain: questions about electrical installation documents, scope and responsibility.
Read article →Distinguish designer, contractor and professional site-direction roles when commissioning an industrialised home in Spain.
Read article →